Golestan stream project The target was to transferring the surface water entering from south east of Tabriz (Golestan stream) to Eeal Goli road. The path length was nearly 2 km in a crowded recreational site Eel Goli Park. The initial design included of a concrete box with dimension of 2x2 m. due to the heavy traffic, the weight of the prefabricated compartments (about 12 ton) and Existing the barriers in the past, execution seemed to be so critical. PROFILEEN® pipes were a great alternative to the concrete ones regarding to the lightness and simplicity of installation.