Tadbir Novin Sazan

(TNS)

South Pars / North Dome Gas-Condensate field-Phases 20 and 21

Phases 20 and 21 development was awarded to OIEC.[46] 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. In May 2008, Repsol and Royal Dutch Shell agreed to exchange block 13 with block 20 or 21

Print Email